Introduction: Building Workflows in monday.com
This guide summarizes a webinar led by Emily Williams, an Implementation Consultant at monday.com, focused on how to approach building workflows and use cases effectively. The goal is to minimize the learning curve, provide a reusable framework for future builds, and help you get your boards right the first time.
For a foundational understanding, refer to the monday.com Tutorial for Beginners: Complete Guide to Get Started in 2024.
Key Terminology
To ensure a shared understanding, the webinar defines several core terms:
- Use Case: A usage scenario for the software. Common examples include:
- Data Repository: Static tracking of information (e.g., a vendor list).
- Ad Hoc Task Management: Managing individual or team task lists.
- Workflow: A structured path describing how something goes from undone to done, involving a sequence of tasks. This is the primary focus of the guide.
- Instance: The piece of work you are tracking within a given use case. For example:
- In a recruitment pipeline, the instance is the candidate.
- In project management, the instance is the project.
- In a legal contract review, the instance is the contract.
Process vs. Project Workflows
The core distinction for choosing a board structure is whether your workflow is a process or a project.
- Process Workflow: The set of tasks is predictable and repetitive. The same steps (with minor deviations) are followed for every instance. Examples include recruitment pipelines, legal request systems, or sales processes. You are typically handling a high volume of instances.
- Project Workflow: Each instance has a structured path, but the steps may vary. The goal is to fulfill a unique outcome. The tasks for each project are often different, even if the overall naming convention (e.g., "Design phase", "Testing phase") stays the same. For deeper insights, see the Expert Guide: How to Manage Projects Like a Pro in monday.com. }```
Board Structure Options
Once you've identified your workflow type, you can choose from three primary board structures:
- Vertical Structure: A single board with a column for each status or stage in the workflow. Best for simple, linear processes where instances move through predictable stages (e.g., a support ticketing system).
- Horizontal Structure: Multiple boards connected via links (e.g., a main project board with sub-boards for individual tasks or phases). Ideal for complex projects with distinct phases or workstreams.
- Hybrid Structure: A combination of vertical status tracking within horizontal boards. For example, a program board (horizontal) that contains projects, each with their own vertical status columns.
For practical examples, review 3 Ways to Track Projects in monday.com: From Simple Boards to Enterprise Portfolio.
Best Practices for Board Building
- Start with the instance: Define what one "row" represents (candidate, project, contract).
- Map the lifecycle: Sketch out the typical stages or steps from start to completion.
- Choose the structure: Vertical for process workflows, horizontal or hybrid for project workflows.
- Limit complexity: Avoid over-engineering. Use columns and automations only when necessary.
- Plan for scale: Consider how your board will handle increased volume or additional team members.
To implement these concepts, follow the Complete Monday.com Tutorial For Beginners (Work Management Guide).
Conclusion
Building effective workflows in monday.com begins with clearly defining your use case, instance, and workflow type. By differentiating between process and project workflows and selecting the appropriate board structure, vertical, horizontal, or hybrid, you can create a scalable, intuitive system that reduces confusion and boosts team productivity. For advanced structuring techniques, explore How to Set Up High Level Low Level Boards in monday.com.
This guide is based on expert insights from monday.com implementation consultants.
[Music] hi there welcome to the building workflows in monday.com webinar
in today's webinar we are going to examine how to best approach building your workflows or use cases in
monday.com we're going to guide you through the considerations and questions to ask yourself to better define your
workflow goals before starting to build your boards the answers to some of these questions
will help you choose what is the most suitable board structure although it is worth mentioning there's no right or
wrong answer only suggestions of best practices in terms of agenda we'll go through a
quick overview of what is monday.com then we'll talk through some key terms so we're all using the same taxonomy as
we're going through this together we'll cover some must ask questions before jumping into building your boards
and then we'll go through some best practices for board building in terms of what structures might fit best for you
then we'll just wrap it up and you'll be off to the races so
first a quick introduction my name is emily williams i am an implementation consultant here at monday.com i've been
with the company for nearly two years implementing clients um of all scales so from a 20 person team to thousands of
people within the teams or company um and i think i've really found a way to understand what's the best way to build
boards regardless of the scale that you're working with or how many use cases you're working with so i hope that
we can share some of this information with you today um and that kind of leads me well into my goals for today so
first is that i think that this can really help minimize your learning curve of getting up and running on monday.com
and understanding what you can use it for second it'll provide a framework for
building in monday.com so if it's you know six months in the future and you have an additional use case you can use
this same framework and apply it to that even once you're outside of your initial learning curve
and then three it's going to save you time because it'll hopefully enable you to build your boards right the first
time so moving on to kind of the first thing in our agenda is what is monday.com so
if you're new to monday.com it's a work operating system that powers your team to run projects and workflows
with confidence so a really customizable platform that can fit any of your needs
whether you're managing a recruitment pipeline or you're a pmo team it can be built in a way that that fits your
specific use case in team the main building blocks of monday.com are something we call boards so i'm
actually going to jump into a real board here and show you kind of the core components of a board again just so
we're on the same page as we move through this webinar so jumping over to this screen
here you're looking at a board that i created so up here we have the board title
here we have different groups in order to group our items in the board so oftentimes we see groupings by not
started in progress complete or another popular one could be q1 q2 q3 and it can also be unique to your team
if you have buckets of categories um within your use case or your projects then we could group it that way
um within the groups we have items so each of the ones that i'm hovering over here is a specific item and against the
item we have columns that are tracking data points against that item so for example with item two my colleague
madeline is assigned to this she completed it and the date was november 19th so we can add on additional columns
as you see fit for your specific use case to in order to capture some key data points or keep your team
aligned and we'll talk a little bit more about that as well as we get into into the content for today
um so now with that we're all aligned on kind of what is monday.com in in a very basic fashion we're going to kind of
jump into the content for today i do want to mention if you have not watched a full basic webinar of
monday.com or or gotten adjusted to the platform in any way prior to this webinar i would recommend
going and watching a basic webinar before you go through this content and then coming back i think it'll set you
up for better success to kind of digest what we're going to talk about today with that i'm going to move on
and we're going to jump into the section of key terms so what are the terms that we're going to be talking about
throughout today and that you should be talking about with your teams and as you're building in monday.com in the
future so the first term is what is a use case at the most basic level use case is a
usage scenario for a piece of software so this term transcends monday.com right but the common use cases that we see in
monday.com are the three that we're looking at below so one is a data repository
what that means is i'm using monday.com just to track a list of my vendors right nothing is really happening in that
board it's just kind of a repository of information maybe asset management all of your
completed or available assets are living in a board nothing's really happening with them but you know you're housing
them there for easy access so anything that's pretty static um in living in the board could be labeled as
a data repository the second one is ad hoc task management and this is a very easy one to get up
and running in monday.com and really just means that you're managing your task list
individually or at a team level right so those are kind of the two basic use cases of monday.com
and we aren't going to focus on either of those today we are actually going to focus on uh workflows so within
workflows which we categorize as a use case for monday.com we're going to talk about two separate types so a process
workflow and a project workflow and i'm gonna go into detail on what that means you know you're probably asking yourself
okay what's the difference between a process and a project and we're gonna go into each of these in a moment but just
keep that in mind that that's going to be the focus for today so now i'm going to move on one slide
and we're going to talk about what is a workflow so at this point we're not even getting into process and project yet
we're just talking about what is a workflow so the way that we have uh defined a workflow is
a sequence of tasks so a path to describe how something goes from being undone to being done
so that probably sounds fairly vague right and and you might be trying to kind of assess
what workflows you have in your company um but let me give you a couple of examples right
a workflow could be a uh recruitment pipeline right we need to track our candidates coming in uh
through the pipeline going through the interview process and then getting to the hiring phase
it could be a legal request system we need to track all of the requests coming into our
company what we're doing with each request how long it's taking and when it's done so
any type of kind of system of working or something that needs to be accomplished
can be categorized as a workflow if it has a sequence of tasks if it's just kind of an ad hoc task again we're going
to bump that to the ad hoc task management but a workflow is more more structured
so now i'm going to go into the next key term that we need to understand which is what is an instance
so this might be the hardest one to explain so an instance is the piece of work you are tracking within a given use
case so remember we're focusing um on the the workflow category of use cases and
that's how these examples um go as well but let me give you a few examples of of what an instance is within a category of
of a use case so recruitment pipeline right that i just kind of mentioned
the instance within a recruitment pipeline would be the candidate right because that's what you're tracking the
candidate comes in you review the candidate's resume you interview the candidate the candidate gets an offer
right so they are the piece of work that is going from um undone to done in project management right what are we
trying to accomplish we're trying to finish projects so projects are the instance right there are multiple tasks
sometimes hundreds right within a project but really the thing that we are trying to accomplish is the project and
then same thing with the legal contract review the contract is going to be the instance there
all right so now we're going to dive into that distinction between a process and a project workflow
so the first one we're going to chat about here is a process workflow so what is a process
the set of tasks in a process workflow is predictable and repetitive you know what's going to happen from a to z
of course there can be areas where you deviate from a to z that's totally fine but in general there's some sort of
template or some sort of process that you go through in order to to fulfill that that use case or that workflow
so again some examples um below and another kind of key part of a process workflow is that you're often
handling a lot of these right there's a reason that it's a process because it's happened again and again in your
organization so you've kind of figured out a way to be more efficient and effective with those those
instances and that's how it's kind of become a process so again you'll see some examples on the
slide here but that's what we're going to categorize as a process workflow as we're going through this i would
highly recommend that you take a piece of paper or open your notes on your laptop and just kind of uh walk
through this presentation with me keeping in mind a use case that you're thinking about so
feel free at this point to jot down uh what use case you're thinking about and and you can do it after the next slide
as well but just kind of keep in mind your specific use case and try and plug it into what i'm talking about here i
think it'll help you help you have a good experience and take something away
so the next thing we're going to talk about is what is a project workflow so we've talked about a process and now we
are on to projects so project workflow um has a structured path similar to a process workflow but
each project may vary in the steps required typically the nature of projects is that you're trying to
fulfill a unique goal right so there may be 50 tasks that are unique to fill one
project's glow goal and 50 completely separate tasks to fulfill another project goal
so yes in terms of we have a project and we do tasks it's a it's a process in a way but all of the steps are unique and
there's not um you don't know what's going to happen from a to z
so that's the kind of difference between a project and a process workflow and again the instance in this uh project
workflow is typically the project itself so there may be some confusion as you're
getting into it and you're like okay i feel like the task within the project is is kind of the instance but what are we
trying to accomplish we're not ultimately trying to accomplish the task as a standalone item we're trying to
fulfill this goal of completing the project all right so i'm going to take a pause
here for everyone to catch their breath and again if you have not already feel free to note down the use case that
you just want to keep in mind as you're going through this and we're going to do a quick knowledge check so
we're going to talk about a few different um a few different
use cases and i want you to think about what they are and then we'll talk about whether you're right or not
so here we go um we have a sales team they're using a contacts board to log
their different contacts and information related to those people so think in your mind what type of use
case is this and let me remind you of the different options we have we have a data repository we have ad hoc task
management we have a process workflow and we have project workflows so i'll pause for a moment and give you
a chance to think about what this is all right so if you guessed data repository then you nailed it and we
started off easy so let's move on to the second one hopefully this one is pretty
straightforward we're just tracking a list of contacts there's nothing actionable happening with these contacts
other than you know updating if if something changes with them but we're not really tracking them in any way
so the next one is a creative team using monday.com to track the steps of creating a unique advertising campaign
for an upcoming product launch so what type of use case is this all right
so this is a project uh and there's a key word in here that gives us um a hint of why this is a project so
the creative team is using this board to track a unique advertising campaign so
if it is unique this means that they haven't done it before that they don't have a template for it it's just kind of
a standalone project so it's it's a project workflow they don't know exactly what they need to do they just know that
they have a unique campaign coming up and they need to manage a project for it all right
so the last one here a team of recruiters are using this board to track candidates as they pass through each
stage of the recruitment process so if you've been listening up to this point i hope that this one is going to be an
easy one for you and i'll give everyone else another minute or so to to consider it
all right so this is going to be a process workflow so you can see in this board
represented here that each item is an applicant again that's going to be our instance in this example
and we're tracking the process they're going through in the columns horizontally right and we're
going to come back to the structure later on but it's important to note that you can see that each of these
applicants are going through the same exact step time over time and that's how we know that this is a process workflow
okay so that was our knowledge check we're kind of moving into the next segment of
this webinar and that is kind of five must ask questions that you should keep in mind before we talk about the best
structure for your use case that you've already identified so again with that use case you've identified go through
these questions with me answer them and then that will kind of empower you to to
move forward so five must ask questions the first question what is your workflow or use
case so i hope that you guys have chosen a workflow and not a data repository or ad hoc task management um but
whatever you chose is okay as well workflows are just a little more complicated
so we've already talked about that and hopefully you haven't noted down the second one is what is your instance
so we've talked about what an instance is but at this time i want you to actually write down or think in your
mind of what that instance is that corresponds to your use case now that you have that
the third question is how many instances are you managing so how many projects are you managing how many
candidates in your pipeline are you managing how many creative requests are you managing
why is this important you're probably wondering so this is important because when you go to build your boards if
you're working at scale we might have some different considerations so if you tell me that you're managing thousands
of of projects versus 20 projects i'm probably going to advise you on a bit of a different structure so that's
why this is important to keep in mind am i building for scale or am i building just to have the best working experience
all right how complex is your workflow so if it's a process workflow is it truly i know
the steps a to z or is there always you know deviations from that and is are there conditional
you know activities that might happen so for example if this happens then we have to add
these additional five steps but if this happens we add additional a different additional five steps so that's one
level of complexity another level of complexity could be how many teams are involved right are
there a ton of different stakeholders coming in and out of this process or is it just your core team so
there's not a formula for defining complexity in workflows but i would just kind of consider what you're working
with and and feel out based on some of the things that we're talking about today
what that complexity uh seems like for you all right the fifth one is what are your
reporting requirements so are you building this workflow in order to give visibility to your leadership team or is
it really important for you to understand uh resource allocation within your team or to be able to report out on
how many of x y and z you're doing in a given month right so what are those requirements if any um this is just
important to note because there are certain ways of structuring your boards that are going to be more amenable to
certain types of reporting requirements so i think these five questions are really
important to keep in mind and you probably won't be able to nail down
the level of importance when you're building your first use case but i hope you know as you continue iterating in
monday.com and in identifying new use cases these questions keeping them in your mind you'll start to see why
they're so important um as you build more and more use cases all right so now for the part that you
guys have probably been waiting for we're going to talk about best practices for board building
so up to this point let's just do a quick recap of what we've talked about right so we've talked about a super
quick overview of monday.com we've talked about uh the key terms to know right so what is a use case
what is a workflow what is an instance so those kind of key key terms uh then we've talked about the key
questions to ask yourself as you're starting to build your workflow or use case so
that's kind of what we've reviewed up to this point and now we're going to take that information and we're going to
translate it into some of the best practices for board building so
three key ways to structure boards and we'll we'll talk about these more in depth later because you're probably
going to be like oh i've seen more ways right but we'll talk about how this can be scaled and how it can be simple but
there are three key ways so the first way is a vertical structure of boards
the second way is a horizontal structure and the third way is going to be a hybrid structure
so what what does this mean let me give you a quick overview before we kind of dive into it but
vertical structure means that you're tracking the the requirements to fulfill the instance
vertically down the board so let me jump back over to my board actually and kind of show
you real quick so tracking vertically down the board so
let's say i rename this to project a and this is you know task one task two
task three this would be a vertical management of project a
okay versus let's say i have in this separate group candidate one firstly i would
never have projects and candidates in one board but just for the purpose of this
and i'm tracking resume screen and maybe i add another status column to
track interview so here i'm tracking candidate 1 which is my instance
horizontally right so i'm tracking it across the item they go through the resume screen they're done now they go
through the interview we're done so this is a vertical management with project a and this is a horizontal management with
project uh or with candidate one so now you're probably like okay i get it vertical horizontal what's hybrid so
hybrid an example of hybrid at least i'm going to go ahead and add a new column here a sub item column
and let's call this candidate 1 and we're going to say overall
status and then we're going to use the sub items to track the steps so we're going to say resume
and we're going to have interview so you can see here that we're tracking the instance horizontally right we have
an overall candidate status and we're tracking different data points horizontally but then the process we're
tracking vertically right so this becomes kind of a hybrid between that vertical structure that we're looking at
up here with project a in the straight vert straight horizontal structure that i showed you previously
with candidate one so hopefully that gives you kind of a an initial understanding of these three
different options and now we're going to jump into um kind of a two separate sections of the best
way to structure boards if you're managing projects and then the best way if you're managing processes
so if you have identified your use case as a project then this next section is going to be relevant most for you
um so managing projects so again projects differ from each other they really follow the same exact steps and
typically the best practice for managing pro projects in monday.com is going to be to use a vertical structure right
that's what i just showed you where the project was the group name and we tracked the task
vertically or downwards uh in the different items so what i showed you was a vertical
single group option where i had one group per project the other option is a vertical single
board which is one board per project so let me show you what that looks like since we we did the vertical single
group so let's say this is define now we're grouping by phases design
we group the project by phases and this becomes project a the board title so our instance is now
the board and we're tracking the tasks vertically throughout the entire board through different phases
this is probably the most intuitive you know structure this is what people immediately think about when they think
about managing a project in monday and it's really great if you're only managing um
a small amount of projects right so if you're managing a large amount of
projects we might want to think about you know the group per project but we're going to go into each so these are the
two different options and now you kind of have them in your mind so vertical single group so
this is going to be the most ideal layout for um project management at scale right so
all projects are tracked on one board it's more manageable for a large number of projects let's think like hundreds of
projects right and reporting is simpler since everything's in one place it's very easy to do that roll up
so again this is kind of a visual of what that looks like right where each project has its own group and we're
tracking the tasks within the items and now we're moving on to vertical single board for managing individual
projects so this is the most robust and intuitive structure if you uh have a clear way of managing
projects you're looking at this and you're like okay we are a pmo team we manage
projects in a waterfall way with clear phases this is probably going to be the the best option for you for sure
so you'll have a board per project and later on the way that we can kind of elevate this
structure is by adding a high level project board where each project has its own item
and each project also has its own board so you can see a whole list or directory if you will of your projects that
correspond to an entire project board that's kind of outside of the scope for today's conversation but just keep in
mind that all of these structures can be elevated in
some way so again some of the advantages here is it's great for robust project workflows
you can drill down on multiple different levels and it's really good if you if you
utilize the dependency function um quite frequently cool
all right so let's look at what an example of this looks like as well so here is uh managing your project in a
single board vertically very similar to what we just shared on the
in the account okay so now we are going to move on to
processes managing processes so again in a process workflow the instance goes through the exact same
steps every time and i say exact but don't get hung up on that word if there is some deviation that is that is okay
we can account for that but typically a horizontal structure is going to be the best choice for process workflows
we'll show you both vertical and horizontal and i think in as we move forward with monday.com as
a product you'll see that you'll kind of work in that hybrid nature of a process as well
but typically a horizontal structure is going to be ideal so let's um
jump into what that means so cool ideal when the steps in a process are repetitive and repeatable
right so some of the advantages here is it's scalable for a large number of instances right we could have thousands
of instances on a board i keep going back to this candidate example right if we're a large
company with hundreds and hundreds of open positions this is going to be a really good option to have um one
candidate per line item we're going to avoid some account clutter by having everything very centralized we're not
going to run into any reporting limitations and we can also update each status column to have different labels
to really customize the process for us um so these are some of the the key
advantages so let's jump into kind of a view of this so one example is a sales pipeline
so you can see here we're grouped by new leads and active leads and each item here
the instance is what i'll give you a second to think about it the instance is the
deal right or the opportunity that that sales rep is working on and you can see that horizontally they're
tracking the different stages so qualifying demo stage negotiations and even in this example you can see
that they're using different labels in each column so in the qualifying stage it's done but in the demo stage it's
demo delivered so it gives you some flexibility in using those different different status columns
so let's show another example so example two we're managing a marketing workflow who is doing campaign
management that has very uh specific steps so each item here is going to be a campaign and it goes through the same
steps research creative copy etc and you can see that they've kind of added quite a few more things to this
horizontal workflow they have a due date for each status column they have a person column or a people column for
every almost every status column right so they're they're adding quite a few things to this workflow to accommodate
cool so now we've talked about kind of the um horizontal workflow for a process and
how that's typically the best option um that in combination with hybrid which we'll we'll talk a little bit about but
i also want to show you how you can use a vertical structure to manage a process as well if that feels like it will fit
your team more so here we have one vertical board for managing a process so
the advantages of this is when there are multiple data points to be tracked in a large number of steps to take so
if you have a process let's let's take employee onboarding for example i think this is a good example where a vertical
board could be relevant so an employee comes on board and they have let's say 200 things they need to do
in the first you know month right that's going to be really hard to
put in columns across the board and might overwhelm the employee but by giving the employee their own dedicated
board for you to manage with them with those 200 tasks vertically even though they're the same exact tasks that every
single employee is going to work through i think it would probably make more sense for them to have their own board
right so that would be a good example of even though it's a process a vertical structure could be
optimal cool here's an example another great example actually is events management so if you follow the same
process for events but you have you know 200 steps that need to be taken for an event um it might make sense to give it
its own board especially if you're not dealing at scale if this is kind of a a unique situation maybe you only have 5
or 10 or even 20 up to 50 i would say events of this size it might make sense to give them their
own board okay so now we are going to move into the
hybrid structure so this is arguably or not arguably i think this is my favorite structure
and i'll talk about why because i think it gives a really good combination of vertical and horizontal structural
elements so you can get the advantages of both and still have a very scalable option
so again what this does is it tracks certain points horizontally usually the instance right is tracked horizontally
think back to what i i showed where we had the candidate as the item and i was tracking the overall status in the
column and then i was tracking you know some of the steps in the sub items right i can jump back as well here's where we
were candidate one overall status and then we're tracking some of those steps in the sub items so
that's kind of the concept of of hybrid so let's take a look at a couple of
examples so a hybrid board for managing a process so here we have a campaign creation
board where each item is the campaign so again the campaign is our instance we're tracking some of the high level
tasks in columns on the high on the the item level horizontally and then you can see we have eight sub items that we're
tracking in in vertically right so this is becomes a hybrid structure
if you follow the same steps for each of these campaigns we do have a way to automate the creation of these sub items
so that your process can still be repeatable and you're not having to update each time but it is
generating in sub items so take a look at our automations if that's something you're interested in
and i'll show you these sub items expanded as well so here you can see these are the the eight steps that they
go through okay so what about a hybrid board for managing projects so this is a really
good option for managing a lot of projects right so you'll have each item is a project
and you'll track the steps to create to complete the project unique steps usually in the sub items so this is a
super awesome option if you're tracking a lot of projects if you answered to question number three
which was how many instances are you managing i would say if you answered more than 50
projects in a month i would choose either this option or a vertical single group option where we're tracking the
project as a group name but all the projects are still on the same board right
so again good for scalable management of projects you can see it's expanded here so
different from our process where those sub items were kind of preset these are going to be unique based on
the project that you're working on just just given the the nature of projects themselves
all right so hopefully you stuck with me through that i want to wrap us up with some some key points here
so summarizing what we've learned so first start by categorizing your workflow as a
project or a process so keep that in mind before you start working on your boards
answer some of the other questions to more deeply understand your workflow and your specific needs right we have a lot
of structural options and some of the answers to your questions can help guide you to one of those options like we
talked about today and then the third thing is just to decide if a vertical horizontal or
hybrid board works best for you based on your answers so
typically vertical is going to be better suited for project workflows or complex process workflows
horizontal will be better suited for process workflows or um or simple project workflows usually not
project workflows but if you have something very simple and then hybrid can be kind of the best of both worlds
right it's really good for scalable processes and projects so that is all i have for you here today
i hope this helped and kind of gave you a framework to move forward with in building your boards whether you're new
to monday.com or you've been working with the platform for months i think this is a a framework and a methodology
that can can benefit any user type uh so let us know how it goes and if this was helpful for you and hopefully we can
save you some time so happy board building and thank you for being here
A process workflow involves predictable, repetitive steps that are followed for every instance, such as a recruitment pipeline or sales process. In contrast, a project workflow has structured paths but tasks may vary for each instance, focusing on unique outcomes like software development or marketing campaigns.
Select a vertical structure for simple, linear processes where instances move through predictable stages, like a support ticketing system. Use a horizontal structure with multiple connected boards for complex projects with distinct phases. Choose a hybrid structure to combine vertical status tracking within horizontal boards for managing portfolios or programs.
Start by defining the 'instance'—what one row represents, such as a candidate, project, or contract. This foundational step ensures your board structure aligns with the specific piece of work you are tracking.
While possible, it's not ideal because process workflows benefit from vertical structures with predictable stages, while project workflows require horizontal or hybrid structures for varying tasks. Combining them in one board often leads to complexity and confusion. It's best to separate them into different boards tailored to each workflow type.
Limit complexity by using columns and automations only when necessary. Start by mapping the lifecycle of your workflow, choose the simplest structure that fits, and avoid adding extraneous fields. Plan for scale by considering future volume and team growth, but resist adding features before they are needed.
Data repositories are static tracking systems for information, like vendor lists, requiring simple boards without status workflows. Ad hoc task management deals with individual or team tasks that lack a structured path. Workflow boards, in contrast, track instances through a sequential lifecycle from start to completion.
After identifying your instance (e.g., a candidate), map the lifecycle stages (e.g., sourced, interviewed, hired). Then choose a vertical board structure with a status column for each stage. Use automations to move instances between statuses and keep the design simple to ensure scalability and ease of use.
Keep this summary
Save it to LunaNotes and it becomes a real note in your library — editable, searchable, and ready to turn into flashcards or a diagram. Free to start.
Save to LunaNotesOr summarise for another video.
This summary and transcript were automatically generated using AI with the Free YouTube Transcript Summary Tool by LunaNotes.
Related summaries
Expert Guide: How to Manage Projects Like a Pro in monday.com
Learn the scalable project management system used by experts in monday.com. This tutorial reveals how to avoid the common mistake of creating a board per project, and instead build a connected, automated workflow from projects to tasks to sub-items. Master status-based automation, Gantt and Kanban views, and crucial formulas for tracking time and profit.
3 Ways to Track Projects in monday.com: From Simple Boards to Enterprise Portfolio
Learn three proven methods to manage and track projects in monday.com, from a basic single-board setup to advanced high-level/low-level board connections, and finally the powerful enterprise portfolio feature. This tutorial by a certified monday.com partner covers practical steps, column rollups, and automation tips to streamline your workflow.
Complete Monday.com Tutorial For Beginners (Work Management Guide)
Learn how to use monday.com from scratch in this comprehensive guide. From setting up your account and workspace hierarchy to boards, columns, automations, docs, and dashboards, this video covers everything you need to master the Work Management plan.
Build High-Level Low-Level Structure in monday.com Step by Step
Learn how to create a clear high-level/low-level board structure in monday.com with a simple 9-step process. This tutorial covers naming conventions, two-way sync, mirror columns, and pro tips to save time when scaling your project management setup.
How to Set Up High Level Low Level Boards in monday.com
Learn how to create a powerful high-level/low-level board structure in monday.com to connect projects and tasks, track progress from macro to micro views, and automate connections. This step-by-step guide covers connected board columns, mirror columns, and match automations to streamline your workflow.
Most viewed summaries
A Comprehensive Guide to Using Stable Diffusion Forge UI
Explore the Stable Diffusion Forge UI, customizable settings, models, and more to enhance your image generation experience.
Kolonyalismo at Imperyalismo: Ang Kasaysayan ng Pagsakop sa Pilipinas
Tuklasin ang kasaysayan ng kolonyalismo at imperyalismo sa Pilipinas sa pamamagitan ni Ferdinand Magellan.
Mastering Inpainting with Stable Diffusion: Fix Mistakes and Enhance Your Images
Learn to fix mistakes and enhance images with Stable Diffusion's inpainting features effectively.
Pamamaraan at Patakarang Kolonyal ng mga Espanyol sa Pilipinas
Tuklasin ang mga pamamaraan at patakaran ng mga Espanyol sa Pilipinas, at ang epekto nito sa mga Pilipino.
How to Install and Configure Forge: A New Stable Diffusion Web UI
Learn to install and configure the new Forge web UI for Stable Diffusion, with tips on models and settings.
Found this summary useful?
Take it with you. One click puts it in your own LunaNotes library.
Save to LunaNotes